Factories and industry
High on-site consumption, ideally with your own solar panels. The battery shifts consumption to cheaper hours, shaves power peaks and makes the most of your solar power.
SE3SE4
The energy transition without a large upfront investment. Battery storage, EV charging and solar for a fixed monthly fee – we and our financing partner fund the equipment, installation and maintenance.
Capacity-as-a-Service works best where the battery sits behind the meter and the electricity is used on site – and where prices fluctuate the most.
High on-site consumption, ideally with your own solar panels. The battery shifts consumption to cheaper hours, shaves power peaks and makes the most of your solar power.
SE3SE4
Warehouses and terminals charging electric lorries, forklifts or company cars. The battery provides charging capacity without the need to upgrade the grid connection.
SE2SE3SE4
Sites with high power peaks or a limited grid connection that want to cut their power tariff and get more out of their connection.
SE3SE4
Not sure whether your site is a good fit? Get in touch – we will assess it based on your consumption and grid connection.
Source: SolarPower Europe (Nov 2025). 2026–2030 are forecasts.
We size and design a system around your site and your energy needs.
Zolar and our financing partner fund the equipment and installation. You only pay a small start-up fee for contracts and legal work.
A predictable payment covering equipment, monitoring and maintenance.
A commercial agreement combining elements of rental and operating lease. Option to buy out the system when the agreement expires.
The agreement covers design, installation and commissioning – from chargers to complete microgrids.
Microgrid / renewable integration
Charging system
Energy storage
A behind-the-meter battery sits on your premises and uses your existing grid connection – delivering immediate savings while also relieving the grid.
| Utility-scale battery | Behind the meter | |
|---|---|---|
| Size | Tens to hundreds of MWh | 1–50 MWh |
| Installation | Dedicated infrastructure | Existing grid connection |
| Permits | Lengthy and complex | Fire safety certificate |
| Delivery time | 18–60 months | 3–9 months |
| Operation | Specialist asset management | Automatic on-site energy management |
| Revenue | Grid services, capacity, trading | Lower electricity costs, power tariff savings and flexibility |
| Service life | 8–15 years | 15–20 years |
Tell us about your site and we will come back to you with a proposed system and monthly fee.